CallRequest a Quote
Services
Service Areas
WorkPricingBuild GuideAboutContactRequest a Quote
A short grill counter with a stone base and a concrete top on a grey composite deck
Outdoor Kitchens

Outdoor kitchenswhere the view is.

An outdoor kitchen moves the cooking to where everyone already is. We build them into decks and patios across Knoxville and East Tennessee, from a proper grill station to full setups with counter space and a sink, using durable materials made to live outside.

The difference between a kitchen and a parked grill is integration: the kitchen is designed into the deck's layout so cooking, seating and the view work together rather than compete. On a lake deck that is the whole game. Nobody wants to cook facing away from the water.

  • Grill stations to full outdoor kitchens
  • Counter space and sinks where the plan calls for them
  • Designed into the deck, not parked on it
  • Durable materials built for the weather
Request a Quote
Outdoor Kitchens

Questions aboutoutdoor kitchens.

What goes into an outdoor kitchen?

As much or as little as the way you cook demands. The core is a built-in grill station; from there it grows into counter space for prep, a sink, and storage: a working kitchen rather than a grill on wheels. We design the setup around how you actually entertain, then builds it from materials made to live outdoors.

Can an outdoor kitchen be built into my existing deck?

Yes. Integration with the existing deck is the point of doing it properly. Weight, clearances and utilities all get planned against the structure that is already there, and the kitchen is built to read as part of the deck rather than an appliance island dropped onto it.

Will an outdoor kitchen survive East Tennessee weather?

Yes. It is built from durable materials chosen to stand up to the elements, the same discipline as the composite decking it sits on. An outdoor kitchen is outside all year by definition, so weathering is treated as the first requirement of the build, not a hope.

Is an outdoor kitchen worth adding to a deck?

If you cook outside more than a few times a summer, usually yes. It turns the deck from a place you carry food to into the place the meal happens, which is what gets a deck used on ordinary weeknights. It also adds real value to the space rather than novelty.

When should an outdoor kitchen be planned, during or after the deck build?

During, if you can. An outdoor kitchen carries real weight and wants utilities, and both are easiest to plan while the framing and layout are still open. The kitchen shapes the deck around it instead of squeezing into what is left. Adding one to an existing deck is done too; it just starts with an assessment of what the structure can carry.

What is required to add an outdoor kitchen to a deck?

Structure that carries the weight, utilities routed to where the cooking happens, and a layout that keeps the grill, the seating and the view working together. All three are settled in a walk-through before anything is priced. An outdoor kitchen is a build, not an appliance purchase, and it is quoted like one.

Why Deck Escapes

What you cancount on.

5.0Google rating across 36 East Tennessee reviews
LifetimeWorkmanship Guarantee on all projects
ZeroStaining, sealing or upkeep on a composite system
Reviews

What East Tennesseesays about us.

Contact

Tell us aboutyour deck.

An old deck you want gone, a porch you want screened, or a blank patch of yard: send the details and we will get you a quote.

Call Us(865) 339-9775
Service AreaKnoxville, TN

Get your free quote

Four quick questions, about a minute. After we visit, your written proposal arrives within 24 to 48 hours.

Step 1 of 4

What are you building?
What is your planning budget?

A rough range is fine. We confirm the real number after we see your yard.

Where is the project?

So we can plan the visit and check your local permit rules.

Where should we send your quote?
Deck gone grey?
Let's replace it.
(865) 339-9775

Get your free quote

Four quick questions, about a minute. After we visit, your written proposal arrives within 24 to 48 hours.

Step 1 of 4

What are you building?
What is your planning budget?

A rough range is fine. We confirm the real number after we see your yard.

Where is the project?

So we can plan the visit and check your local permit rules.

Where should we send your quote?