What does a deck costin Knoxville?
A small ground-level composite deck off your back door starts around $10,000. A deck with railing, stairs and room for a table of six runs $20,000 to $35,000, and a deck with a covered section starts around $50,000. The table shows what each budget typically builds.
| Budget | Typical size | What it usually includes |
|---|---|---|
| $10K – $20K | 12′ × 10′120 sq ft | A ground-level composite deck off your back door, with room for a grill and two chairs. |
| $20K – $35K | 16′ × 12′192 sq ft | A composite deck with railing and one set of stairs, with room for a table for six. |
| $35K – $50K | 20′ × 14′280 sq ft | A larger composite deck with separate dining and lounge areas, and deck lighting. |
| $50K – $70K | 24′ × 16′384 sq ft, 8′ covered | A composite deck with a covered section by the house for shade and rain. |
| $70K – $90K | 28′ × 18′504 sq ft, 10′ covered | A covered deck with a generous open area, lighting and premium railing. |
| $90K – $100K+ | 32′ × 20′640 sq ft, 12′ covered | A full outdoor living space: covered porch or screen room, open deck and lighting. |
What changes the price
Height off the ground
A raised deck needs taller posts, more framing and longer stairs than a deck at ground level.
Railing and stairs
Railing runs along every open edge, and each set of stairs adds to the price.
A roof overhead
A covered section, a pergola or a screen room adds a second structure above your deck.
Removing your old deck
Tearing out and hauling away an old deck is part of the price of a replacement.
The decking line
Each composite brand makes a standard and a premium line. The premium boards cost more and carry longer warranties.
Permits and your yard
Permits, a steep slope or a backyard our crew cannot drive to all change the price.
A planning guide, not a quote. Your exact price comes in a written proposal within 24 to 48 hours of our visit.
See what your budget can build.
Drag the slider for a typical deck size at each budget.
Typically: A composite deck with railing and one set of stairs, with room for a table for six.
| $10K – $20K | 12′ × 10′ (120 sq ft) | A ground-level composite deck off your back door, with room for a grill and two chairs. |
|---|---|---|
| $20K – $35K | 16′ × 12′ (192 sq ft) | A composite deck with railing and one set of stairs, with room for a table for six. |
| $35K – $50K | 20′ × 14′ (280 sq ft) | A larger composite deck with separate dining and lounge areas, and deck lighting. |
| $50K – $70K | 24′ × 16′ (384 sq ft) | A composite deck with a covered section by the house for shade and rain. |
| $70K – $90K | 28′ × 18′ (504 sq ft) | A covered deck with a generous open area, lighting and premium railing. |
| $90K+ | 32′ × 20′ (640 sq ft) | A full outdoor living space: covered porch or screen room, open deck and lighting. |
A planning guide, not a quote. It assumes a ground-level deck with one set of stairs. Height, permits, removing an old deck and difficult sites change the price.
What your deck coststhe longer you own it.
A wood deck costs less to build, but needs a restain every 2-3 years. A composite deck never needs restaining.
Over 20 years, composite costs $2,700 less than pressure-treated wood.
Composite pays for itself by year 16, then keeps saving.
Build prices are national averages for a 16 × 20 ft deck from Zonda’s 2025 Cost vs. Value report: $78 per sq ft for composite, $57 for pressure-treated wood. Restaining is $3 per sq ft every two years, the middle of published contractor prices. Your proposal carries our exact price.
What people askabout the price.
How do I get an exact price for my deck?
We visit your home, talk through your ideas, your budget and your material options, and send a written proposal within 24 to 48 hours.
Does the price include the permit?
We draw the plans and get the permit for you before the build starts, and walk the crew through your project before day one.
Why does a composite deck cost more than wood?
Composite boards cost more than pressure-treated lumber up front. A composite deck needs no staining or sealing, so the gap closes every time a wood deck would need a restain. The comparison on this page shows when.
What does the Lifetime Workmanship Guarantee cover?
It covers our workmanship on every project, and it begins the day your new deck is finished.
Tell us aboutyour deck.
An old deck you want gone, a porch you want screened, or a blank patch of yard: send the details and we will get you a quote.
