CallRequest a Quote
Services
Service Areas
WorkPricingBuild GuideAboutContactRequest a Quote
New composite stairs and black aluminum railing on a rebuilt deck
Deck Remodeling

Deck remodelingsame spot, new deck.

A remodel keeps the deck you have and replaces what shows: new composite surface, new railing, and where the plan calls for it a bigger footprint or a changed layout. It is the middle path between repairing a tired deck and tearing one out.

Recent remodels around Knoxville have run TimberTech Tigerwood and Mahogany, Trex Toasted Sand, Deckorators Sandbar with a dark slate border, and Fiberon Beach House, finished with black aluminum, white composite or Westbury vertical-cable railing. The line is chosen per job; never staining any of them again is the constant.

  • New composite surface on sound existing framing
  • TimberTech, Trex, Deckorators and Fiberon lines
  • Railing in aluminum, composite or vertical cable
  • Footprints expanded and layouts changed mid-remodel
Request a Quote
Deck Remodeling

Questions aboutremodeling a deck.

What is the difference between a deck remodel and a deck repair?

A repair fixes what is failing: a handful of boards, a loose railing, a soft spot. A remodel replaces the surfaces wholesale: new decking, new railing, and often a new layout, on framing that is still sound. If more of the deck is being replaced than kept, you are in remodel territory, and the walk-through is how we tell you which side of the line you are on.

Which composite decking brands do you install?

TimberTech, Trex, Deckorators and Fiberon. Recent East Tennessee projects have run TimberTech Tigerwood and Mahogany, Trex Toasted Sand around a Knoxville pool, Deckorators Sandbar bordered in dark slate in Maryville, and Fiberon Beach House in Friendsville. The line and colour are chosen per project. The options are priced side by side in the quote.

Can you make the deck bigger during a remodel?

Yes. Once the surface and railing are off, extending the framing is the natural moment to do it. A Maryville remodel in TimberTech Mahogany expanded the deck's footprint as part of the same job. If the deck has always been slightly too small for the table, the remodel is when that gets fixed.

What railing can replace my old wood railing?

Three families cover almost every remodel: black aluminum with thin vertical balusters, which all but disappears against a view; composite rail matched to the deck; and Westbury's vertical-cable system for a more contemporary line. All three end the sanding-and-repainting cycle that wood railing demands.

When is it time to remodel a deck instead of patching it?

When the surface is past saving but the bones are good. Grey, cupped boards and a dated wood railing on sound framing is the classic case around Knoxville. Patching that deck buys a season, while a remodel replaces the surface and railing once and ends the cycle. If you are fixing the same deck every spring, you are already paying for the remodel in instalments.

What does a deck remodel involve from start to finish?

A walk-through and framing assessment first, then the decking and railing options priced side by side. TimberTech, Trex, Deckorators and Fiberon are all lines we install. Once chosen, the old surface and railing come off, the frame gets corrected where it needs it, and the new system goes down. The frame staying is what makes a remodel faster and less expensive than a full rebuild.

Why Deck Escapes

What you cancount on.

5.0Google rating across 36 East Tennessee reviews
LifetimeWorkmanship Guarantee on all projects
ZeroStaining, sealing or upkeep on a composite system
Reviews

What East Tennesseesays about us.

Contact

Tell us aboutyour deck.

An old deck you want gone, a porch you want screened, or a blank patch of yard: send the details and we will get you a quote.

Call Us(865) 339-9775
Service AreaKnoxville, TN

Get your free quote

Four quick questions, about a minute. After we visit, your written proposal arrives within 24 to 48 hours.

Step 1 of 4

What are you building?
What is your planning budget?

A rough range is fine. We confirm the real number after we see your yard.

Where is the project?

So we can plan the visit and check your local permit rules.

Where should we send your quote?
Deck gone grey?
Let's replace it.
(865) 339-9775

Get your free quote

Four quick questions, about a minute. After we visit, your written proposal arrives within 24 to 48 hours.

Step 1 of 4

What are you building?
What is your planning budget?

A rough range is fine. We confirm the real number after we see your yard.

Where is the project?

So we can plan the visit and check your local permit rules.

Where should we send your quote?